狠狠躁夜夜躁人人爽天天5,久久久精品午夜免费不卡,久久亚洲av成人无码电影,永久黄网站色视频免费观看

Products
Your location:home page > Products > Power plant system electrical and energy-saving products

BW-BTBM Power plant boiler is high temperature and wall temperature monitoring system

Add time:2021-11-24 11:09:23   Number of views:514  

Power plant boiler is high temperature and wall temperature monitoring system in power plant distributed control system (DCS), original plant-level supervisory information system (SIS) and plant-level data management information system (MIS), on the basis of process model by means of - body development platform (IMMS), a mathematic model of the high temperature heating surface and the metal wall temperature calculation model of pipeline life, The obtained parameters are then returned to the interface of the power station network server and client. In the IMMS modeling process, parameters required by relevant calculation are written, such as boiler structural parameters, coal quality parameters, thermal calculation thermal physical parameters and system control parameters, etc. Then, the wall temperature and service life of different positions of heating surface can be obtained through the original monitoring data of power station.

It is an important condition and guarantee for the safe and economical operation of boilers to rationally configure the concentration of pulverized coal at the nozzle and the wind speed at the outlet of the burner. The on-line monitoring system has reliable measuring components, accurate signal processing, intuitive and practical screen, which can guide combustion and adjust the air powder evenly and reasonably. The technology has reached the advanced level in China. It provides conditions and basis for operators to monitor the wind speed and coal powder of each burner and to optimize and adjust the combustion in time and effectively.

Main functional features

● Online monitoring of wind speed at the exit of each primary air duct burner.

● Each air duct coal concentration online monitoring.

● To achieve optimal combustion control, to achieve each air duct - times of wind speed I coal powder regulation, balanced combustion.

● Online monitoring of secondary wind speed.

● Boiler heat loss and boiler efficiency on-line monitoring and combustion optimization guidance.

● Use screen monitor to monitor and process the above parameters in real time, and have rich display function of multiple pictures.

● Use the display to compare the primary wind speed and coal powder concentration of the bar chart, guide the boiler wind speed and coal powder concentration level, reduce the smoke temperature deviation, prevent wind, powder caused by boiler fire accident, so that the boiler in a better operating condition.

Copyright ? Hebei Bowei Electric Co., LTD. http://www.vmb611.com All Rights Reserved    
HomeTelProduct
精品久久久久久无码人妻中文| 又大又粗又长的高潮视频| 99久久99久久加热有精品| 亚洲乳大丰满中文字幕| 菠萝蜜国际通道一区麻豆| 女人被爽到高潮视频免费国产| AV片免费大全在线观看不卡| 国精产品999一区二区三区有限| 美女毛片一区二区三区四区| 午夜男女无遮挡拍拍流水视频| 国产妇女馒头高清泬20P多| 国产熟睡乱子伦视频观看软件| 国产美女被遭强高潮免费一视频| 国产精品户露AV在线户外直播| 特级做a爰片毛片免费看| 玩弄牲欲强老熟女| 亚洲午夜私人影院在线观看| 欧美国产伦久久久久久久| 麻花豆剧国产MV在视频播放| 亚洲AV中文无码字幕色三| 夜夜躁狠狠躁日日躁| 亚洲精品aa片在线观看国产| 欧美中日韩免费观看网站| 亚洲AV永久无码精品秋霞电影影院| 免费的成人A级毛片| 无码成人一区二区三区| 亚洲人成网站免费播放| 久久久久久久久久国产精品免费| 成人国产精品免费视频| 免费人成视频X8X8老司机| 国产69久久精品成人看| 日韩人妻无码精品二专区| 亚洲色大成网站WWW永久一区| 国产精品三级av及在线观看| 日韩乱码人妻无码中文字幕久久| 国产精品vⅰdeoxxxx国产| 无码AV免费一区二区三区| 欧美日韩国产一区二区三区不卡| 国产精品自产拍在线观看55| 亚洲日本韩国欧美云霸高清| 提莫影院AV毛片入口|